Wednesday, 19 October 2016
Friday, 14 October 2016
Location Changes
Due to the inconvenience of westfield having a very popular football matching going on the same time when we would have like to have been recording we are not able to record there anymore. However we have come up with a plan B in which we will be recording in ilford Exchange which also has assess to escalators that plays a big role in the narrative of the filming.
Thursday, 13 October 2016
Wednesday, 12 October 2016
Tuesday, 11 October 2016
Monday, 10 October 2016
Ideas For Video
Actors:
For our music video we was planning to require a male actor and as well as a female actor to feature in the video.
Location:
The video would take place in a variety of location in the video that would result in a variety of cuts.
Props:
· Phone
· Casual clothing
· T-shirt
· Jeans
· blazers
· Wallet
For our music video we was planning to require a male actor and as well as a female actor to feature in the video.
Location:
The video would take place in a variety of location in the video that would result in a variety of cuts.
Props:
· Phone
· Casual clothing
· T-shirt
· Jeans
· blazers
· Wallet
Risk Assessment Hyde Park
Risk Assessment
Production
Title: Jahkoy - Poison
Crew
Director’s: Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael
Cinematographer’s:
Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael
Address of
shoot: Hyde Park, London
Date:
11/10/16
The
following potential risks / hazards might be present:
Floor space, Tripping hazards, low
lighting, adverse weather / temperatures, Electrical cords and sockets,
Flammable materials, Crowds Fatigue, Traffic, Animals, Scaffolding / working at
height, Stunts / dangerous activities, Water
Where
present, please list them below:
Risk / Hazard identified
|
People affected
|
Existing controls
|
Action to be taken to reduce risk or
hazard
|
||
Cords
|
Everyone
Involved (Cast and Crew)
|
Cable
Management
|
Upgrade
the original Cable management and keep the set as tidy as possible.
|
||
Trip
Hazards
|
Everyone
Involved (Cast and Crew)
|
No
Existing Controls
|
Setup
Tables and cover which will cover up the hazards so the cast don’t get
injured.
|
||
Electrical
Supplies
|
Everyone
Involved (Cast and Crew)
|
Cover
Ups and no open cords.
|
Make
sure all electrical inputs are covered up and all safety needs are met.
|
||
Fatigue
|
Cast
|
No
Existing Controls
|
Seats
will be placed and regular refreshment breaks will be given to all cast and
crew.
|
||
Damage
to Expensive Hardware
|
Everyone
Involved (Cast and Crew)
|
No
Existing Controls
|
Equipment
will only be used when needed and all safety needs are met.
|
||
Pedestrians
and Customers
|
Everyone
Involved (Cast, Crew and Pedestrians)
|
No
Existing Controls
|
Not
to go at peak times to record. Only go at times when there is few people.
|
||
Water
and Spilled Fluids
|
Everyone
Involved (Cast, Crew and Pedestrians)
|
Hazard
Waring Cones
|
To
no keep fluids near the equipment and clear the scence before and after
recordings
|
||
Risk Assessment Westfield
Risk Assessment
Production
Title: Jahkoy - Poison
Crew
Director’s: Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael
Cinematographer’s:
Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael
Address of
shoot: Westfield, Montfichet Rd, London E20 1EJ
Date:
11/10/16
The
following potential risks / hazards might be present:
Floor space, Tripping hazards, low
lighting, adverse weather / temperatures, Electrical cords and sockets,
Flammable materials, Crowds Fatigue, Traffic, Animals, Scaffolding / working at
height, Stunts / dangerous activities, Water
Where
present, please list them below:
Risk / Hazard identified
|
People affected
|
Existing controls
|
Action to be taken to reduce risk or
hazard
|
||
Cords
|
Everyone
Involved (Cast and Crew)
|
Cable
Management
|
Upgrade
the original Cable management and keep the set as tidy as possible.
|
||
Trip
Hazards
|
Everyone
Involved (Cast and Crew)
|
No
Existing Controls
|
Setup
Tables and cover which will cover up the hazards so the cast don’t get
injured.
|
||
Electrical
Supplies
|
Everyone
Involved (Cast and Crew)
|
Cover
Ups and no open cords.
|
Make
sure all electrical inputs are covered up and all safety needs are met.
|
||
Fatigue
|
Cast
|
No
Existing Controls
|
Seats
will be placed and regular refreshment breaks will be given to all cast and
crew.
|
||
Damage
to Expensive Hardware
|
Everyone
Involved (Cast and Crew)
|
No
Existing Controls
|
Equipment
will only be used when needed and all safety needs are met.
|
||
Pedestrians
and Customers
|
Everyone
Involved (Cast, Crew and Pedestrians)
|
No
Existing Controls
|
Not
to go at peak times to record. Only go at times when there is few people.
|
||
Water
and Spilled Fluids
|
Everyone
Involved (Cast, Crew and Pedestrians)
|
Hazard
Waring Cones
|
To
no keep fluids near the equipment and clear the scence before and after
recordings
|
||
Risk Assessment Studio
Risk Assessment
Production
Title: Jahkoy - Poison
Crew
Director’s: Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael
Cinematographer’s:
Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael
Address of
shoot: Studio; Leyton Sixth Form College E10 6EQ
Date:
11/10/16
The
following potential risks / hazards might be present:
Floor space, Tripping hazards, low
lighting, adverse weather / temperatures, Electrical cords and sockets,
Flammable materials, Crowds Fatigue, Traffic, Animals, Scaffolding / working at
height, Stunts / dangerous activities, Water
Where
present, please list them below:
Risk / Hazard identified
|
People affected
|
Existing controls
|
Action to be taken to reduce risk or
hazard
|
Cords
|
Everyone
Involved (Cast and Crew)
|
Cable
Management
|
Upgrade
the original Cable management and keep the set as tidy as possible.
|
Trip
Hazards
|
Everyone
Involved (Cast and Crew)
|
No
Existing Controls
|
Setup
Tables and cover which will cover up the hazards so the cast don’t get
injured.
|
Electrical
Supplies
|
Everyone
Involved (Cast and Crew)
|
Cover
Ups and no open cords.
|
Make
sure all electrical inputs are covered up and all safety needs are met.
|
Fatigue
|
Cast
|
No
Existing Controls
|
Seats
will be placed and regular refreshment breaks will be given to all cast and
crew.
|
Damage
to Expensive Hardware
|
Everyone
Involved (Cast and Crew)
|
No
Existing Controls
|
Equipment
will only be used when needed and all safety needs are met.
|
Thursday, 6 October 2016
Subscribe to:
Posts (Atom)